PROJECT OVERVIEW

The Harper Team performed major upgrades to two (2) pump stations for the Woodruff-Roebuck Water District. The Moore Pump Station was completely demolished and replaced with two 1,500 gpm horizontal split case booster pumps housed in a new facility. The Highway 101 Pump Station features a refurbished pump station building and refurbished pumps. Both buildings contain new VFD pump controls, piping, and valves and have been landscaped to blend into the existing locations. Harper ESD self-performed the installation of all piping and valves.