Schwartz WWTP Sludge Digester Aeration System

PROJECT OVERVIEW

The project included the installation of new aeration systems for the aerobic digesters at the Schwartz WWTP. Harper self-performed the installation of two new turbo blowers, blower piping, and fine bubble diffusion systems in the three digesters. The Harper Team also completed the demolition of the existing centrifugal blowers and blower piping and electrical and demolition of the existing aeration systems in the two small diameter digesters. Demolition work also involved the electrical switchgear.