PROJECT OVERVIEW

Harper completed extensive upgrades at three (3) Charlotte Water treatment plants. Each WTP required the installation of at least one (1) day tank and one (1) bulk storage tank, ranging in capacity from 400 gallons to 15,000 gallons. The Harper Team self-performed the installation of the tanks, as well as the site preparation and installation of the associated metering pumps and piping. The project also included a pre-engineered metal building and associated lighting and appurtenances at one of the WTPs.