GHS Family YMCA

PROJECT OVERVIEW

Harper constructed this building that consists of 55,000 SF. It includes a full-size gymnasium, training rooms, locker rooms, weight facility, cardio theater, and full-service kitchen. This construction was completed in 13 months.

Two years later, Harper partnered with Greenville YMCA and McMillan Pazdan Smith through a Construction Manager At-Risk contract to successfully aid in the design and construction of the new outdoor swimming facilities, pool equipment rooms, added locker rooms, and renovated lobby spaces.

The outdoor swimming facility consists of the new construction of an eight-lane, 25 yard swimming pool along with a new zero entry children’s pool. The new outdoor pool consists of an outdoor heating unit equipped with a new canvas bubble to be used in the winter for year-round swimming. This additional work also included an add-on to the side of the existing facility of 2,000 SF for pool equipment.