Alternative Delivery/Construction Manager At-Risk

Alternative Delivery/Construction Manager At-Risk

Construction Manager At-Risk (CMAR) is a common sense, alternative construction delivery method that brings the owner, architect, and construction management team together at precisely the right time during project planning …. from the very beginning.

By utilizing this approach, the Harper team is able to leverage the full capacity of our resources to ensure your project ultimately arrives on-time and within the desired budget.

Benefits Include:

  • Project Feasibility Studies
  • Guaranteed Maximum Pricing (GMP)
  • Market Verified Project Budgets
  • Building Information Modeling (BIM) / Virtual Construction
  • Virtual Design Coordination
  • Design Collaboration & Material Recommendations
  • Materials & Constructability Analysis
  • Life Cycle Analysis
  • Risk Management Analysis

Case Study

Drayton Mills Elementary

Spartanburg County School District 7 selected Harper to serve as the Construction Manager At-Risk for the construction of their new elementary school, Drayton Mills Elementary. During the design phase...

Request Case Study

What People Are Saying

“Working with Harper through the Construction Manager At-Risk process was seamless. I had never procured a contractor utilizing that method, but immediately felt secure in knowing that the experienced Harper Team was part of our team. We were all working toward the same goal – their success was our success, and vice versa.”

Dianna Gracely
Former City Administrator
(for Travelers Rest City Hall)